1 edition of Two-dimensional morphological modelling for Sariakandi Bank protection work, Site B1 (1999-2000) found in the catalog.
Two-dimensional morphological modelling for Sariakandi Bank protection work, Site B1 (1999-2000)
Published
2001
by Surface Water Modelling Centre in Dhaka
.
Written in English
With reference to Bangladesh.
Edition Notes
Other titles | 2 dimensional morphological modelling for Sariakandi bank protection work, site B1, 1999-2000 |
Contributions | River Bank Protection Project (Bangladesh), Surface Water Modelling Centre (Bangladesh), Bangladesh. Pāni Unnaẏana Borḍa. Bogra O & M Circle. |
Classifications | |
---|---|
LC Classifications | QH193.B35 T85 2001 |
The Physical Object | |
Pagination | 2 v. : |
ID Numbers | |
Open Library | OL3589105M |
LC Control Number | 2002290640 |
Status of GPSE monitoring indicators in CFUGs of Doti district
High precision optical interferometry and application to Be stars.
Space games in Tzotzil
The photographs of Russell Lee
Microscopical preparations illustrating the structure of certain tissues and organs of man and animals in health and disease.
When grandmother was young
White on white
How to draw people and animals
Pacific regional solar heating handbook
Half a minutes silence
THE PRESENT STATE OF INTERNATIONAL LAW AND OTHER ESSAYS
Thoughts and affections on the passion of Jesus Christ for every day of the year
Yellowstone & Grand Teton
Stroke units
Catalina
First Solos for Treble Viol (Oxford Music for Viol)
Two-dimensional morphological modelling for Sariakandi Bank protection work, Site B1 (): forecast of critical hydraulic and morphological condition in monsoon: final report. Also Titled. 2 dimensional morphological modelling for Sariakandi bank protection work, site B1, Other Authors.
Get this from a library. Two-diment[sic]ional morphological modelling for Sariakandi Bank protection work, Site B1: forecast of critical hydraulic and morphological condition in monsoon, final report.
[Surface Water Modelling Centre (Bangladesh); Bangladesh. Ministry of Water Resources.; Bangladesh. Pāni Unnaẏana Borḍa.; River Bank Protection Project (Bangladesh);] -- With. bank-protection works (Mosselman, ), has demanded bank at Sariakandi, 40 km upstream of Sirajganj (Figure. satellite images and two-dimensional morphological mod.
first concerns the subjective nature of design work, which requires a myriad design criteria to be balanced against one another. Whereas many individual designers have a solid grasp ofthis process in practice, it is poorly explained in theory.
Until designers are able to enunciate the process clearly, computer assistance will be oflittle use.